A Course for the Future. Implementation of the Allplan Precast BIM System at the First DSK

Number of journal: 5-2021
Autors:

Torosyan N.G.

DOI: https://doi.org/10.31659/0044-4472-2021-5-14-18
УДК: 624:004.925

 

AbstractAbout AuthorsReferences
The first DSK has been operating in the Russian construction market since 1961, having rightfully won the title of one of the leaders in the construction industry. The factory production of the First DSK makes it possible to produce reinforced concrete structures for houses on individual projects using the industrial method of house construction. Combining modern approaches with the modernization of production facilities, the First DSK can bring to life any project conceived by an architect or designer. The buildings of the new generations resemble a constructor: the sections are assembled from different series. The average construction period of the building, taking into account the engineering equipment and finishing, is about 12 months.
N.G. TOROSYAN, Deputy Head, Precast Concrete Division of Design Directorate (This email address is being protected from spambots. You need JavaScript enabled to view it.)

“The First DSK” LLC (13, bldg. 1, Myasnitskaya Street, Moscow, 127974, Russian Federation)

1. Kurkin M.V., Efimenko R.S. Individual project of a prefabricated-monolithic house in Allplan: advantages of BIM for the designer and the concrete prefabrication factory. Zhilishchnoe Stroitel’stvo [Housing Construction]. 2020. No. 3, pp. 36–41. (In Russian). DOI: https://doi.org/10.31659/0044-4472-2020-3-36-41
2. Nikolaev S.V. Renovation of housing stock of the country on the basis of large-panel housing construction. Zhilishchnoe Stroitel’stvo [Housing Construction]. 2018. No. 3, pp. 3–7. (In Russian).
3. Arkaev M.A., Hertz V.A., Syrodoeva L.V. Design of large- panel objects in the ALLPLAN software package. Materials of the all-Russian scientific and methodological conference “University complex as a regional center of education, science and c culture”. Orenburg state University. 2018. Pp. 28-32.
4. Kazus A.I. Experience in the use of BIM technologies when designing 12–14-storey double-section residential building in Kazan. Zhilishchnoe Stroitel’stvo [Housing Construction]. 2015. No. 5, pp. 56–61. (In Russian).
5. Flexibility of production of reinforced concrete products for large-panel industrial housing construction and connection of design with production. Zhilishchnoe Stroitel’stvo [Housing Constructions]. 2020. No. 3, pp. 27–29. (In Russian).
6. Shapiro G.I., Zenin S.A., Sharipov R.Sh., Kudinov  O.V. Rationing in large-panel housing construction: the new set of rules on design of large-panel constructive systems. Promyshlennoe i grazhdanskoe stroitel’stvo. 2018. No. 2, pp. 10–15. (In Russian).

For citation: Torosyan N.G. A course for the future. Implementation of the Allplan Precast BIM system at the First DSK. Zhilishchnoe Stroitel’stvo [Housing Construction]. 2021. No. 5, pp. 14–18. (In Russian). DOI: https://doi.org/10.31659/0044-4472-2021-5-14-18


Print   Email