Positive Aspects of the National Project on Labor Productivity on the Example of the Kazan DSK

Number of journal: 5-2021
Autors:

Krasinikova H.M.,
Nekrasov A.B.,
Minnixanova A.I.

DOI: https://doi.org/10.31659/0044-4472-2021-5-19-21
УДК: 69.056.53

 

AbstractAbout AuthorsReferences
In June 2019, the Federal Competence Center (FCC) and “Kazan DSK” LLC signed a cooperation agreement for the implementation of the National Project «Labor Productivity and Employment Support» of the Federal and Regional Projects «Targeted Support for Improving Labor Productivity at Enterprises». The project «Improving Labor Productivity in the Production of Reinforced Concrete Slabs on the Sommer Circulation Line» was adopted as a pilot project. The experience of the Federal Center of Competence in the field of labor productivity which helps enterprises to implement the principles of lean production within the framework of the National Project «Labor Productivity and Employment Support», has shown that on – site diagnostics can timely identify plant losses – the main ballast of the production process. The article shows the results of participation in the national project: leveling losses leads to a significant reduction in the production process time, makes it possible to reduce the production of defective products, increase the time of proper operation of equipment, free up production spaces, ensure product quality growth and, ultimately, significantly increase profits. Conclusions are also drawn about the necessity (or inevitability) of investing in employee training. The materials of the article may be useful for managers of reinforced concrete products plants to make decisions on methods (ways) to increase labor productivity.
N.M. KRASINIKOVA, Candidate of Sciences (Engineering), Chief Technologist, (This email address is being protected from spambots. You need JavaScript enabled to view it.),
A.B. NEKRASOV, Director (This email address is being protected from spambots. You need JavaScript enabled to view it.),
A.I. MINNIXANOVA, HR-business-partner ((This email address is being protected from spambots. You need JavaScript enabled to view it.)

"Kazan DSK" LLC (118, Adelya Kutuya Street, Kazan, 420087, Russian Federation)

1. Krasinikova N.M., Khozin V.G., Borovskikh I.V. Assessment of the state of reinforced concrete factories of “medium capacity” built in the Soviet period. BST. 2017. No. 10, pp. 25–28. (In Russian).
2. Shilkina A.T., Yaskin A.N. Sustainable consumption and lean production initiatives in the context of development strategies of the russian federation and national projects in various areas. Kachestvo. Innovatsii. Obrazovaniye. 2020. No. 6 (170), pp. 49-57. (In Russian).
3. Dolzhenkova Yu.V., Polevaya M.V., Kamneva E.V. The state and prospects of growth in labor productivity of workers in the framework of the national project “Labor productivity and employment support”. Ekonomika. Nalogi. Pravo. 2019. Vol. 12. No. 6, pp. 6–16. (In Russian).
4. Gorodetskaya P.I. National project “Labor productivity and employment support” as a tool to improve the efficiency of the use of labor resources. Mezhdunarodnyy nauchno-issledovatel’skiy zhurnal. 2020. No. 1–2 (91), pp. 6–11. (In Russian).
5. Savelyeva A.D., Nesterova Yu.D. National project “Labor productivity and employment support”, its impact on the number of employees of the enterprise. In the collection: Innovative personnel management. Materials of the XI International Interuniversity Personnel Forum named after AND A.Ya. Kibanova. 2020, pp. 131–134. (In Russian).
6. National project “Labor productivity and employment support” https://xn--b1aedfedwqbdfbnzkf0oe.xn--p1ai/ru/national-project/about_project/ (date of treatment 11/19/2020). (In Russian).

For citation: Krasinikova H.M., Nekrasov A.B., Minnixanova A.I. Positive aspects of the national project on labor productivity on the example of the Kazan DSK. Zhilishchnoe Stroitel’stvo [Housing Construction]. 2021. No. 5, pp. 19–21. (In Russian). DOI: https://doi.org/10.31659/0044-4472-2021-5-19-21


Print   Email