Zhilishchnoe Stroitel’stvo №3-2019

Number of journal: 3-2019
DOI: https://doi.org/10.31659/0044-4472-2019-3


Table of contents:

 

Large-panel housing construction  
S.V. NIKOLAEV
Innovative Replacement of Large-Panel Housing Construction by Panel-Monolithic Housing Construction (PMHC)
3-10
Progressive House-Building System Based on BIM ALLPLAN (Information) 11-13
V.M. PILIPENKO
Industrial Housing Construction in the Republic of Belarus at a New Qualitative Level
14-19
Management of Business-Processes on the Basis of the Full BIM Cycle (Information) 20-21
R.Yu. VODOPIANOV, V.E. GUBCHENKO
The Use of the System “Engineering Nonlinearity 2” PK LIRA-CAD for Calculation of Panel Buildings along with Structures of the Frame of Ground Non-Residential Floors
22-28
KNAUF for Industrialized Construction (Information) 29-32
V.A. SHEMBAKOV
Innovation Industrial Technology of Precast-Monolithic Frame Developed by GC “Rekon-SMK” and used 20 Years at the RF Market
33-38
Domestic Construction Materials 2019 – the Season of Construction Exhibitions is Open (Information) 39
V.I. TRAVUSH, G.I. SHAPIRO, V.I. KOLCHUNOV, E.V. LEONT'EV, N.V. FEDOROVA
Design of Protection of Large-Panel Buildings against Progressive Collapse
40-46
E.F. FILATOV, A.V. IVANKOV
Strengthening of Reinforced Concrete Products of Large-Panel Buildings Damaged by Cracks
47-52
Heat protection of buildings  
O.D. SAMARIN, K.I. LUSHIN
Assessment of the Relationship of Heat Gain from Solar Radiation on Latitude to Calculate the Energy Saving Class of the Building
53-56
Town planning and architecture  
M.A. SLEPNEV, A.V. POPOV
Ecological Capacity of Urban Natural and Anthropogenic Territorial Complexes
57-60
Transition to Project Financing and the Availability of Counterfeit Products in Construction Can Reduce the Volume of Sales of Manufacturers of Building Materials (Information) 61
Common Information Space for the Organization of Joint Work. Example from Finland (Information) 62-64